WRIKU ‘s core philosophy always provides users with sustainable products and solutions, serving  attentively and  building quality with professionalism, credibility and integrity   Read More

Core Drilling Rig Crawler XY-2L
You are here: Home » PRODUCTS » Screen &Cyclone » Exploration Core Drilling Rig » Core Drilling Rig Crawler XY-2L

loading

Share to:
sharethis sharing button

Core Drilling Rig Crawler XY-2L

Coring and exploration drill rig, Crawler mounted type XY-2L is a coring drill rig integrated with crawler track mechanism, tower, mud pump and console. It can be used in core drilling as well as geological surveying, hydrology, water well and constructions for large diameter drilling. The drill rig is small in size and has light weight as well as detachable. It weighs only 950kg excluding the engine and can be transported in 8 different parts where the largest part has weight 140kg. Therefore, it is suitable for works especially in mountainous areas and network of waterway as it can be transported easily. The drilling depth is 100-530m.
Availability:

drilling rig facrtory

Drill Rig XY-2L

XY-2L Crawler Core Drilling Rig

WRIKU@XY2-L Coring and exploration drill rig, tower mounted type XY-2L is a coring drill rig integrated with crawler track mechanism, tower, mud pump and console. It can be used in core drilling as well as geological surveying, hydrology, water well and constructions for large diameter drilling. The drill rig is small in size and has light weight as well as detachable. It weighs only 950kg excluding the engine and can be transported in 8 different parts where the largest part has weight 140kg. Therefore, it is suitable for works especially in mountainous areas and network of waterway as it can be transported easily. The drilling depth is 100-530m.

drilling rig site

drilling rig facrtory

Drill Rig XY-2L

Feature of Core Drilling Rig

1. Integrated crawler walking mechanism, drilling tower, mud pump and operating platform;

2. The crawler walk, the base support, and the landing and take-off of the rig are all driven by the hydraulic system of the rig itself, which is easy to operate.

3. the machine has realized the overall relocation of the complete set of drilling equipment, improved the drilling construction efficiency and reduced the labor intensity of workers

4. The drilling tower of the rig has the functions of taking off and falling, folding and folding, which is easy to walk and transport.

5. The drill has more (8 gears) speed series and reasonable speed range, and low speed torque is relatively large, wide range of use.

6. The drilling machine has a two-gear reversal speed, which is easy to deal with accidents.

7. The feeding process of the vertical shaft of the drilling rig is as long as 600mm, which is conducive to improving drilling efficiency and reducing the occurrence of accidents such as drilling blocking and drilling burning.

8. The rig adopts double oil pump for oil supply, less power consumption and lower oil temperature in the hydraulic system.

9. The rig control handle is less, the layout is reasonable, the operation is flexible and reliable.

10. In addition to the regular closed hydraulic upper chuck, the drill is also equipped with mechanical manual lower chuck.


drilling rig site

drilling rig facrtory

 parameters

Drilling depth

100~530m

Drilling diameter

Φ75~Φ45mm

Diameter of drilling pipe

Depends on the choices on drilling hole

Power head


1stgear

2nd gear

3rd gear

4th gear

5th gear

Rotational speed output (r/min)

65

114

180

248

310


6thgear

7th gear

8th gear

Counter-clockwise 1

Counter-clockwise 2


538

849

1172

51

242

Rated maximum torque output

2760N.m

Up down feeding stroke of the power head

600mm

Winch

Lifting ability (Single rope 1stlayer)

30KN

Maximum lifting speed of single rope

1.948m/min

Steel rope specification

14mm

Capacity for the steel rope

45m

Power

Electric motor model

4100

Power

30KW

Rotational speed

1500r/min

drilling rig site

Rig Parts 1Rig Parts 4

Previous: 
Next: